Grid Load
72%
// ANSWER CONFIRMED
system verdict
Bringing your own generation will allow data centers to interconnect faster.
ROUND 02 VERDICT
Partial Myth
This is being discussed at the state, utility and regional level (e.g., PJM) but few have set tariffs or processes.
Load shape has changed over time as new types of data center load expand.
Load varies (and has always) due to things like:
Potential to expedite intern=connection by 6-12 mos
Requirements: Generation must be >= Load (adjusted for outages)