Grid Load

72%

// ANSWER CONFIRMED

system verdict

Proceed to Round 03

Bringing your own generation will allow data centers to interconnect faster.

ROUND 02 VERDICT

Partial Myth

This is being discussed at the state, utility and regional level (e.g., PJM)  but few have set tariffs or processes.

Load shape has changed over time as new types of data center load expand.

Load varies (and has always) due to things like:

  • Potential to expedite intern=connection by 6-12 mos

  • Requirements: Generation must be >= Load (adjusted for outages)